Turn BIM Compliance Requirements into Practical Project Value
Many AEC projects specify ISO 19650 compliance without clear protocols for how task teams should author, share, and sign off data. The result is chaotic file versions, broken CDE permissions, and non-compliant handover packages. DigiBuild Solutions acts as your external Senior BIM Manager, establishing transparent information workflows that protect project liability and satisfy client requirements.
Who Needs BIM Management
- Lead Appointed Parties: Require a compliant pre- or post-appointment BEP and Master Information Delivery Plan (MIDP).
- General Contractors: Manage multi-subcontractor CDE uploads, approval gates, and model federation discipline.
- Client Organizations & Developers: Formulate Exchange Information Requirements (EIR) and verify handover deliverables.
- Distressed BIM Projects: Rescue projects with overdue clash backlogs, disorganized CDE structures, or template drift.
Information Governance Scope
- EIR to BEP Alignment: Translating client project requirements into clear, task-team specific modeling instructions.
- CDE Architecture: Setting up Autodesk Construction Cloud or BIM 360 with ISO 19650 state folders (WIP, Shared, Published, Archive).
- Level of Information Need (LOIN): Defining exact geometrical (LOD) and alphanumeric (LOI) requirements per stage.
- Handover Verification: Solibri rule sets validating asset tagging and COBie schema compliance before project closeout.
ISO 19650 Information Management Lifecycle
A systematic, auditable roadmap aligned with the international standard for information management using BIM.
Assessment & BEP Drafting
Authoring the project-specific BIM Execution Plan (BEP), naming conventions, role matrix (RACI), and software version baseline.
CDE Configuration
Structuring folder hierarchies, user permission tiers, and automated approval workflows on Autodesk ACC / BIM 360.
Model Health & QA Auditing
Running scheduled Solibri audits and custom Python checks to verify shared parameter population, origin coordinates, and warnings.
Digital Handover & COBie
Compiling and validating the final digital asset data drop, COBie spreadsheets, and buildingSMART openBIM IFC archives.
Management Deliverables & Artifacts
BIM Execution Plan (BEP)
Comprehensive pre- or post-contract documentation defining protocols, exchange milestones, and technical standards.
TIDP & MIDP Delivery Matrices
Task Information Delivery Plans tracking model submittal dates, responsible authors, and level of information need.
Model Audit Reports
Formal milestone health reviews documenting geometric integrity, coordinate accuracy, and parameter compliance.
COBie & FM Handover Data
Verified COBie spreadsheets and IFC asset registers formatted for computer-aided facility management (CAFM) ingestion.
Explore Related DigiBuild Solutions Services
Need Strategic BIM Management?
Discuss your project information requirements, CDE setup, or ISO 19650 audit needs with Mohamed Bassem Khemissi.